Kingston Business Parrk

One STOP Solution

Kingston business PARRK, a multi utility building project located at the hub of Business junction, MANGULI SQUARE, is connecting Kolkata, Chennai, Delhi & Mumbai with the twin city of Cuttack & Bhubaneswar, It has given you an opportunity for a new opening to your business. The design principals of Kingston Business PARRK have created a blend between aesthetics & functionality. Each office & apartment is carefully crafted to satisfy all your comfort needs in an amicable environment. With its large array of amenities to suit the requirement of every business, it provides an ideal milieu for living a happy and contented life in the same premises.

Time today is precious and priceless. Kingston Business PARRK saves your time in traveling from your business place to your home, by bringing all your needs at one stop. Come step in live your life & grow your business as you have always imagined & dreamt of.

Major Amenities & Facilities

  • Excellent Location.
  • Grand Driving Avenue.
  • Ample Covered Car Park.
  • Lift in each Block.
  • Multipurpose Community Hall.
  • Full Inter-connectivity through EPBAX.
  • Round the Clock Surveillance and Security.
  • Modern Aesthetic Elevation.
  • Sewage Treatment Plant.
  • Rain Water Harvesting.
  • Convenience Store.
  • Power Backup.
  • Business Centre.
  • Cafeteria.
  • Sophisticated Fire Fighting System.

One STOP Solution

  • STAY
    88 Units 1 BHK 440 sqft to 717 sqft
    06 Units 2 BHK 1003 sqft to 1050 sqft
  • OFFICE
    74 Units 383 sqft to 1092 sqft
  • WAREHOUSE
    08 Units 3149 sqft to 5309 sqft
  • SHOWROOM
    01 Unit 10857 sqft
  • WORKSHOP
    01 Unit 11681 sqft

Specification

  • WAREHOUSE
    1. Structure-R.C.C. frame construction with brick Partition walls.
    2. Flooring-V.D.F.
    3. Internal Finish-Plaster &P.O.P.
  • Common Toilet
  • A. Wall-Ceramic tiles up to 7’-6” height.
  • B. Flooring-Ceramic tiles.
    C. Fitting- Jaquar /Essco.
  • Canteen
    A. Wall- Ceramic tiles up to 7’6” height all around.
    B. Flooring-Ceramic tiles.
    C. Others-Granite counter with stainless steel sink.
  • Widows – Aluminum casement/sliding.
  • Doors –M.S Rolling shutter.
  • Electrical-Electrical work with copper wiring in surface conduits.
  • OFFICE
1. Structure-R.C.C frame construction with brick partition walls.
2. Flooring- Vitrified.
3. Internal Finish-Plaster & P.O.P.
  • 4. Toilet-
    A. Wall-Ceramic tiles up to 7’-6” height.
    B. Flooring-Ceramic tiles.
    C. Fitting- Jaquar /Essco.
    D. Others-Provision for only cold water supply.
  • 5. Canteen-
    A. Wall- Ceramic tiles up to 7’6” height all around.
    B. Flooring-Ceramic tiles.
    C. Others-Granite counter with stainless steel sink.
  • Widows – Aluminum casement/sliding.
  • Doors-Painted flush door with Godrej lock.
  • Electrical-Electrical work with copper wiring in concealed conduits till D.B. only.
  • Lifts-Two automatic lifts.
  • RESIDENCE
    1. Structure-R.C.C frame construction with brick partition walls.
    • 2. Flooring
      A. Drawing/Dining-Ceramic tiles.
      B. Bedrooms-Ceramic tiles.
      C. Balcony-Anti skid ceramic tiles.
      D. Lift lobby- Vitrified.
    3. Internal Finish-Plaster & P.O.P.
    • 4. Toilet-
      A. Wall-Ceramic tiles up to 7’-6” height.
      B. Flooring-Ceramic tiles.
      C. Fitting- Jaquar /Essco.
      D. Others-Provision for hot and cold water supply.
    • 5. Kitchen-
      A. Wall-ceramic tiles up to 2’ height above kitchen platforms.
      B. Flooring-Ceramic tiles.
      C. Others-Granite counter with stainless steel sink.
    • Widows – Aluminum casement/sliding.
    • Doors-Painted flush door with Godrej lock.
    • Electrical-Electrical work with copper wiring in concealed conduits. Provision of sufficient light and socket point in all rooms, TV and telephone socket in drawing, dining and bedrooms.
    • Lifts-One automatic lift in each block.

Construction updates

  • Construction updates : 11/06/2015

  • Construction updates : 11/06/2015

  • Construction updates : 11/06/2015

  • Construction updates : 11/06/2015